blogs.wti.com

blogs.wti.com

WTI – Western Telematic Inc.

blogs.wti.com RSS Feed
 
 
 
 

Archive for May, 2008

Happy Friday! Remote Reboot this Weekend?

Friday is here! I hope everyone in the who reads this worldwide has a great, relaxing weekend. Now, being a sales professional I can’t sign off without a SOMETHING sales related. This is for all  Network Engineers, Network Managers, Data Center Managers whom might read this. Scenairo: Your at home enjoying a nice weekend with friends and family [...]

Only an insider will laugh

For those of you who wonder what our MPC unit looks like from the inside out. I saw this on the workbench in the office next door and I thought it looked pretty cool. It is really four MPC units tied together and talking to each other for easier administrator. They are connected via a high [...]

Take a little protection with you

I mentioned before that we have an MPC (Managed Power Controller, a PDU to the rest of us) sitting out there on the Internet (mpc.wti.com). We leave the protocols that should REALLY be closed when running in a real world environment open (i.e. Telnet, web, SNMPV1/V2) to see what kind of attacks that we can [...]

Extended trial period Windows Vista up to 120 days

If you are one of the few growing numbers that are running Windows Vista and you are confused by the dizzying array of choices they offer for that Operating System. Here is a way to extend the Activation Keys up to 120 day, from the normal 30 days. Here’s how to re-arm the Windows Vista [...]

No one is going to read this anyway

Since is this is the first (and hopefully not the last depending on management) and no one EVER read first posts of a new blog anyway. Let get some history out of the way. I have been working at WTI on and off for over 20 years. I am a Windows, Macintosh, Linux, Blackberry, Web, [...]

Server locked up at a remote location?

Tired of driving across town at odd hours just to power cycle a “locked up” network device? WTI’s Managed Power Controller allows you to do this task from your home or office. Join the 21st century and include a Managed Power Controller in every rack that is important to your organization while saving them money and your precious [...]

Reduce Data Center Power Costs with MPC Switched PDU

Reduce power consumption and costs in the Data Center with scheduled equipment shutdowns using WTI MPC Series Intelligent Switched PDU. The rising cost of energy consumption by computing equipment in general, and those found in data centers in particular, has become a tremendous concern to everyone—not just people in the computer industry. Awhile back, the government got involved [...]

Twitter links powered by Tweet This v1.6.1, a WordPress plugin for Twitter.